. 1. Based on the attached table or Excel QM, the upper control limit for averages__________ is. (Please round it to two decimal points and include no units.) 2. Based on the attached table or Excel QM, the lower control limit for averages__________ is. (Please round it to two decimal points and include no units.) 3. Based on the attached table or Excel QM, the upper control limit for ranges__________. (Please round it to two decimal points and include no units.) 4. Based on the attached table or Excel QM, the lower control limit for ranges is__________. (Please round it to two decimal points and include no units.) 5. The overall average of these means is__________, and the overall average range is_________. (Please round it to one decimal point and include no units.) 6. Based on the result in Question 5 and the attached table f
or Part 1 or Excel QM, the upper control limit for a 99.7% control chart for the mean/average is____________ . (Please round it to two decimal points and include no units.) 7. Based on the result in Question 5 and the attached table in Part 1 or Excel QM, the lower control limit for a 99.7% control chart for the mean/average is ______________. (Please round it to two decimal points and include no units.) 8. Does this process appear to be in control in terms of the mean? A. Yes. B. No. 9. Based on the result in Question 5 and the attached table for Part 1 or Excel QM, the upper control limit for a 99.7% control chart for the range is___________ and the lower control limit is___________ . (Please round it to two decimal points and include no units.) 10. Does this process appear to be in control in terms of the range? A. Yes. B. No.